Home
Contact Us
Glossary
En Español
Hartford Line Website—Service Launched June 2018
Plan Future Trips—Easy Access to Fares & Schedules »
Objectives & Scope
Overview
History
An Expanded Regional Intermodal Network
Funding
Infrastructure Upgrades
Schedule
Interactive Program Map
Benefits
Regional Vision
Information Center
Construction Updates
Archived Construction Updates
News Briefs
Archived News Briefs
Interactive Program Map
Media Kit
Library
Environmental Assessment
Stay Informed
Question or Comment?
Glossary
Related Links
FAQs
Media Gallery
Construction Updates
Archived Construction Updates
News Briefs
Archived News Briefs
Interactive Program Map
Media Kit
Library
Environmental Assessment
Overview
Notice of Availability
Cover and Signature
Executive Summary
1.0 Introduction
2.0 Purpose and Need
3.0 Alternatives Evaluation
4.0 Affected Environment
5.0 Agency Coordination and
Public Involvement
6.0 List of Preparers
7.0 Distribution List
8.0 References
List of Figures
List of Tables
Volume II Concept Design Drawings and Environmental Resource Graphics
Appendices
Get Email Updates
Now is the time to get involved. Please sign up for project updates via email.
(
*
required)
Do not fill this textbox.
Email Address:
*
City/Town:
select
Berlin
East Hartford
East Long Meadow, MA
East Windsor
Enfield
Hamden
Hartford
Long Meadow, MA
Meriden
New Britain
New Haven
Newington
North Haven
South Windsor
Springfield, MA
Suffield
Wallingford
West Hartord
Windsor
Windsor Locks
If you do not see your City/Town from the current list, please type it in the list above.
add me
Information Center
Environmental Assessment
List of Figures
Figure ES-1 - NHHS Rail Corridor and Proposed Improvements
Figure 1-1 - NHHS Rail Corridor Connects Rail Service across the Northeast
Figure 1-2 - Location of Proposed Track and Facility Improvements
Figure 4-1 - Typical A-weighted Sound Levels for Transit and Non-transit Sources
Figure 4-2 - Comparison of Various Noise Levels
Figure 4-3 - State-Endangered Sickle-Leaved Golden Aster Near Wharton Brook, North Haven
Figure 4-4 - Berlin CT Train Station
Figure 4-5 -Former Windsor Locks Train Station
Figure 4-6 - Windsor CT Train Station
Figure 4-7 - Archaeologically Sensitive Area at Wallingford 2
Figure 4-8 - Archeologically Sensitive Area at Berlin
Figure 4-9 - Archeologically Sensitive Area at Windsor
Figure 4-10 - Archaeologically Sensitive Area at Windsor Locks 1
Figure 4-11 - Archeologically Sensitive Area at Enfield
Figure 4-12 - Archaeologically Sensitive Area at Springfield Layover
Figure 4-13 - Bushnell Park, Hartford CT
Figure 4-14 - Aerial view of Bushnell Park (with rail line on the left)
Figure 4-15 - Railroad Operations Simulation Corridor
Figure 4-16 - No-Build Track Configuration
Figure 4-17 - Illustration of Level of Service Definitions